• Welcome to BirdForum, the internet's largest birding community with thousands of members from all over the world. The forums are dedicated to wild birds, birding, binoculars and equipment and all that goes with it.

    Please register for an account to take part in the discussions in the forum, post your pictures in the gallery and more.
ZEISS DTI thermal imaging cameras. For more discoveries at night, and during the day.

RSPB Middleton Lakes (1 Viewer)

Underfoot

Just wondered what it's like underfoot on the Wetlands Trail now, planning a visit on Wednesday but don't want to go wading!

Cheers
Tom
 
17/4/14 Middleton Hall Redpoll by feeders.
Silt Pool Reed Warbler
fisher's mill Green Sand, Whitethroat, Sedge Warbler, Snipe.
fisher's mill meadow Whitethroat
Dosthill lake Whitethroat, Sedge Warbler.

Regards, John
 
23/4/14 Middleton Hall
Heronry view pool Reed Warbler singing and Garden Warbler singing behind the wildlife only sign at the end of the farm paddock.
Fisher's mill Glossy Ibis, 13 House Martin, 2 Reed Warbler singing.

Regards, John
 
Garden Tiger

At Dosthill lake yesterday a Garden Tiger larvae was seen sunning, once a Common Moth throughout Warwickshire, now you are lucky to see one anywhere in Warwickshire.

Regards, John
 

Attachments

  • 007#057.jpg
    007#057.jpg
    170.3 KB · Views: 64
Copied and pasted...

River Tame Footbridge
Hi all, (especially Moocher),

sorry for the delayed reply, I dont check this every day and have been out of the office for most of the last week.

The bridge is a bit harder to provide information on as the delivery of it lies with a third party, Hanson so out of our hands. I can try to provide some clarity into the situation from what I do know and hopefully that is helpful.

The bridge is part of the restoration agreement for Middleton Hall Quarry (much of which is now Middleton Lakes). The agreement between Hanson and Staffordshire CC states that the bridge is required to complete the planning obligations outlined when consent was given for quarrying.

Hanson are committed to deliver the bridge but have to meet various requirements in advance of construction.

The specification for the bridge has been signed off by the Councils highways department and the two councils (Staffs and Warks) have agreed to amendments to the public footpaths to include the bridge so that it can officially be adopted by the council. All the landowners are currently being consulted.

Because of the delays Hanson have needed to re-apply for Environment Agency consent for the structure and its foundations and this is in process.

The bridge has been partly fabricated and the contractors lined up to do the foundations. The lead in for bridge delivery and construction is several weeks so at the moment the best case scenario is for the bridge to be installed this autumn. I am afraid that I cannot guarantee when the bridge construction will start or be complete but you can be assured that we are helping Hanson wherever we are able and 'encouraging' them as best we can as we want to see the bridge in place as much as anyone.

It is very frustrating and the bridge saga has been going on as long as I have been working here (7 years) with rarely a day passing without someone asking me about it so fingers crossed it will be installed soon.

Sorry I am not able to provide any more certainty but I will aim to keep everyone informed when I do know more detail about timings.

All the best,

Nick

Nick Martin
Senior Sites Manager, Middleton Lakes
 
Great day at Middleton today. Weather and light amazing :) Small whirlpool forming and reforming sluce by the bridge!
 

Attachments

  • FF73A92B-20E8-4E38-A758-D1B7938E1104.jpeg
    FF73A92B-20E8-4E38-A758-D1B7938E1104.jpeg
    4.2 MB · Views: 9
  • 90423C80-0BD5-444D-BB00-221A4CCA7176.jpeg
    90423C80-0BD5-444D-BB00-221A4CCA7176.jpeg
    4.1 MB · Views: 6
  • C4BB6DE1-70A9-44E7-AC6D-FEA83269875E.jpeg
    C4BB6DE1-70A9-44E7-AC6D-FEA83269875E.jpeg
    4.2 MB · Views: 5
  • 61861441-5319-46BE-A046-83C28C7EDE61.jpeg
    61861441-5319-46BE-A046-83C28C7EDE61.jpeg
    4.3 MB · Views: 5
  • 5A91F3E9-6C3D-48B4-93C9-C54698E020F9.jpeg
    5A91F3E9-6C3D-48B4-93C9-C54698E020F9.jpeg
    3.6 MB · Views: 5
  • D4E4CB83-A562-4147-8831-8037E2525AB8.jpeg
    D4E4CB83-A562-4147-8831-8037E2525AB8.jpeg
    3.8 MB · Views: 6
  • BE6FFD5E-5B78-4D1F-BDAC-9AD7A4ACE5DE.jpeg
    BE6FFD5E-5B78-4D1F-BDAC-9AD7A4ACE5DE.jpeg
    4.2 MB · Views: 8
  • 46BE82C6-D249-4426-A4E7-D2897B1D0ECC.jpeg
    46BE82C6-D249-4426-A4E7-D2897B1D0ECC.jpeg
    3.3 MB · Views: 7
  • 773DB659-EF9E-4D10-8422-1A6A1D2D7A28.jpeg
    773DB659-EF9E-4D10-8422-1A6A1D2D7A28.jpeg
    4.1 MB · Views: 7
  • 5AE02F85-978A-44FA-8F7B-116BE8110E7A.jpeg
    5AE02F85-978A-44FA-8F7B-116BE8110E7A.jpeg
    4.2 MB · Views: 7
  • 06C7E5A6-83D8-469F-A345-116FD1280867.jpeg
    06C7E5A6-83D8-469F-A345-116FD1280867.jpeg
    2.9 MB · Views: 6
  • A68B20B4-1F54-471B-9A17-59E2FEC73F82.jpeg
    A68B20B4-1F54-471B-9A17-59E2FEC73F82.jpeg
    3 MB · Views: 8
  • 2ED7E020-F68E-4421-9ED3-4DB77F8BCC95.jpeg
    2ED7E020-F68E-4421-9ED3-4DB77F8BCC95.jpeg
    2.9 MB · Views: 7
Another fabulous afternoon, weather much better than I thought it would be. Definitely needed wellies though!
 

Attachments

  • P1120652.jpeg
    P1120652.jpeg
    7.2 MB · Views: 5
  • P1120650.jpeg
    P1120650.jpeg
    8.7 MB · Views: 4
  • P1120648.jpeg
    P1120648.jpeg
    7.4 MB · Views: 5
  • P1120646.jpeg
    P1120646.jpeg
    9.2 MB · Views: 5
  • P1120639.jpeg
    P1120639.jpeg
    8 MB · Views: 4
  • P1120638.jpeg
    P1120638.jpeg
    8.6 MB · Views: 4
  • P1120634.jpeg
    P1120634.jpeg
    7.1 MB · Views: 5

Users who are viewing this thread

Back
Top